CIVIL AND BUILDING WORKS
 
   
 
.............................................................................................................................................................................................................................
 
 
Marine Works
 
     
     
 
SEPARI COAL LOAD OUT EXPANSION PROJECT, EAST KALIMANTAN  
P.T. MAHAKAM SUMBER JAYA , November 2007 - May 2008  
- Load Out Expansion Construction :  
  • Offshore (Loading Jetty and Marine Conveyor Support) Work and Onshore Foundation (Conveyor Foundation).
 
   
JETTY CONSTRUCTION PROJECT, SUNGAI 03 AND 04, PALARAN SAMARINDA, EAST KALIMANTAN  
P.T. SARANA ABADI LESTARI , 2005 - 2006  
- Jetty and Trestle platform 03 : 1,050 m2 - Jetty platform : 2 unit, Mooring Dolphin for Jetty 03 : 1 unit.  
- Cat Walk for Jetty 03 : 2 unit - Cat Walk , spaned 55 m' ( Steel truss frame ), Breasting Dolphin Jetty 04.  
- Steel Bollard: Capacity 25 ton , 9 unit  
- Rubber Fender Da-A400 (M1) 1000 + 1200 L , 17 unit  
   
CONSTRUCTION OF FUEL UNLOADING JETTY PROJECT, PLTD SUPRA PARE - PARE, SULAWESI  
P.T. STOWINDO POWER , 1997  
- 2 units Breasting Dolphin and 2 units Mooring Dolphin Works:  
  • Unloading Platform, * Steel Pipe Pile Ø 609 mm, t = 12 mm, L = 30 m; Concrete Pile Cap and Fender Wall.
  • Bollard, capacity 35 ton, 1 unit each Dolphin, Rubber Fender Type Cell 100, 1 unit each Breasting Dolphin.
 
- 6 units Walk Way and Pipe Support Steel Pipe Pile Ø 508 mm, t = 12 mm, L = 26 m  
   
URGENT DEV. OF SEMARANG PHASE II, STAGE I PROJECT OECF LOAN IP - 379, SEMARANG, CENTRAL JAVA  
DIRECTORATEGENERAL OF SEA COMMUNICATION, 1995  
- Dredging 556,000 m3 - Retaining Wall 357 m. Container Wharf ( 345 x 25 ) m. Reclamation Revertment 1,420 m  
- Reclamation 500,000 m4. Soil Improvement 106,000 m2 of Vertical Drain. Pavement Container Yard 70,000 m2.  
- Road and Building Site 32,000 m3. Concrete Beam Foundation 7,100 m3. Building Construction 8,180 m2.  
- Drainage System 5,310 m. Utility Water Piping Installation and Electrical System.  
   
SEA WATER INTAKE PIT, ANYER, WEST JAVA  
P.T. AMOCO MITSUIP.T.A INDONESIA , 1995 - 1996  
- Sea Water Intake Pit  
- Furnish and Driving Steel Sheet Pile for Conferdam (42 x 21) m2  
  • Larsen 16 w, depth 15 m and Reinforced Concrete Pit (34,500 L x 17,900 W x 9,000 D) m.
 
   
SAMARINDA PORT PROJECT, SAMARINDA, EAST KALIMANTAN  
DIRECTORATE GENERAL OF SEA COMMUNICATION , 1995  
- Replacement of Wooden Jetty to Concrete Jetty 100 m x 50 m  
  • P.C. Spun Pile Ø 500 mm, 3,920 m. Reinforced Concrete 1,230 m3, Rubber Fender 24 pcs, Bollard 6 pcs, Retaining Wall 125 m.
  • Dredging 22,500 m3, Reclamation Works 11,960 m3. Steel Sheet Pile FSP II A, 17 m, 370 pcs, Steel Sheet Pile FSP II A, 30 m, 150 pcs.
 
   
EXTENTION JETTY PROJECT, TONASA IV, BIRINGKASI, SOUTH SULAWESI  
P.T. SEMEN TONASA , 1995  
- Offshore Piling  
  • Pile CP Work, Phase I.
 
- Onshore Precast Fabrication  
  • Beam Fender Wall Precast, Installation of all Precast System, Cast Insitu, Phase II, Install Bollard, Rubber Fender, Cleat and Crud Ulin Timber.
 
   
SAMARINDA PORT PROJECT, SAMARINDA, EAST KALIMANTAN  
DIRECTORATE GENERAL OF SEA COMMUNICATION , 1994  
- Concrete Jetty 120 m x 15 m  
  • P.C. Spun Pile Ø 500 mm, Total 3,660 m, Reinforced Concrete 1,375 m4, Rubber Fender 26 pcs, Bollard 7 pcs.
 
- Retaining Wall 125 m  
  • P.C. Spun Pile Ø 500 mm, Total 1,875 m, Reclamation Works 19.688 m4, Steel Sheet Pile FSP II A, 17 m, 370 pcs, Steel Sheet Pile FSP II A, 30 m, 150 pcs.
 
   
JETTY CONSTRUCTION PROJECT, MERAK, WEST JAVA  
P.T. SARI SARANA KIMIA , 1992  
- Breasting Dolphin Works, 4 pcs  
  • Supply and Driving Steel Pipe Pile Ø 609.6 mm and Ø 508 mm, Total 1,104 m'.
 
- Mooring Dolphine Works, 4 pcs  
  • Supply and Driving Steel Pipe Pile Ø 609.6 mm and Ø 508 mm, Total 1,152 m'.
 
Mooring Bitt 70 ton - 2 pcs, 50 ton - 2 pcs - Cathodic Protection  
- Loading Platform Works  
- Concrete Trestle L 130 m  
   
CONSTRUCTION OF MOORING DOLPHIN PROJECT CIGADING PORT, CILEGON, WEST JAVA  
P.T. KRAKATAU STEEL , 1989  
- Mooring Dolphine Works  
  • Steel Pipe Pile Ø 762 x L 30 m, Concrete: 60.8 m3, Cat Walk, Bollard 100 ton, 1 pcs.
 
   
PASSENGER TERMINAL AND RELATED FACILITIES PROJECT BALIKPAPAN, EAST KALIMANTAN  
PERUM .PELABUHAN IV , 1988  
- Passanger Terminal and Related Facilities