CIVIL AND BUILDING WORKS
 
 
Site Reclamation
 
 
.............................................................................................................................................................................................................................
 
 
Site Reclamation
 
     
     
 
TUNU NORTH CAMP SITE PREPARATION TN / CSPI - 01 PROJECT TUNU, EAST KALIMANTAN  
TOTALFINAELF E&P INDONESIE , August 2002 - July 2003  
- Engineering, Procurement and Construction  
  • Soil Investigation.
  • Site Preparation.
  • Dredging and Reclamation.
  • Wooden Retaining Wall.
  • Loading / Unloading Jetty and Speed Boat Jetty.
  • Helipad and Bridge/
  • Perimeter Light and Floodlight for Helipad.
  • Cathodic Protection.
  • FRP for Fire Water Line.
 
   
MUTIARA SITE REHABILITATION 2000 / 2001 ( M - 8 ) PROJECT MUARA BADAK, EAST KALIMANTAN  
VICO INDONESIA , June 2000 - November 2001  
- Soil Improvement  
- Revegetation Works  
  • Slope Erosion Control, Supply and Installation of Planting Media, Supply and Installation of Fruit Tree, Supply and Installation of Non Fruit Tree, Gabion Drainage Channel, Bore Pile and Pile Cap, Gabion Retaining Wall.
 
   
SITE PREPARATION WORK FOR INDONESIA MERAK No. 2 PTA UNIT PROJECT MERAK, WEST JAVA  
P.T. AMOCO MITSUI P.T.A. INDONESIA , 1995  
- Site Clearing 290,000 m2  
- Soil Filling and Compaction 530,000 m3  
- Shore Protection by Rip-Rap 200 m  
   
GRESIK COPPER SMELTER PROJECT, GRESIK, EAST JAVA  
CHIYODA INTERNATIONAL INDONESIA ( Main Contractor ) 1997 - 1998  
- Piping Works: ( PVC/RFP, CS, SS304 and 316, Low Temperature, Galvanized):  
  • Fabrication and Installation of Piping works for Process, Utility and Offsite ( around equipment, on rack around furnace etc.) Total work volume: 235,000 Dia.in.