RETAINING WALL WORK PROJECT, JALAN BUJANGGA, TANJUNG REDEB, BERAU, EAST KALIMANTAN  
DINAS PEKERJAAN UMUM , February 2008 - November 2008  
- Retaining Wall Work:  
  • Steel Sheet Pile, ( FSP IIIA x 81 m'.), Steel Sheet Pile, (FSP IVA x 45 m'.)
 
   
RETAINING WALL WORK PROJECT, P. TENDEAN-MARTADINATA, BALIKPAPAN, EAST KALIMANTAN  
DINAS PEKERJAAN UMUM , 2007  
- Retaining Wall Work:  
  • Steel Sheet Pile FSP, 1.800 m' (0,4 @ 12.00 m).
 
   
RETAINING WALL WORK PROJECT PULAU DERAWAN , TANJUNG REDEB, BERAU, EAT KALIMANTAN  
DINAS PEKERJAAN UMUM , June 2006 - December 2006  
- Retaining Wall Work:  
  • Driving Concrete Sheet Pile and Common Embankment.
 
   
RETAINING WALL WORK PROJECT SEI KANDILO - JLN YOS SUDARSO SAMARINDA, EAST KALIMANTAN  
DINAS PEKERJAAN UMUM , 2002  
- Retaining Wall Work :  
  • Bore Pile, Driving Concrete Sheet Pile, Common Embankment.
 
   
RETAINING WALL WORK PROJECT SANGALAKI - JLN P. DERAWAN BERAU, EAST KALIMANTAN  
DINAS PEKERJAAN UMUM , 2001  
- Retaining Wall Work:  
  • Steel Sheet Pile FSP III A x 15 m, Soil Filling.
 
   
RETAINING WALL SEI KANDILO JALAN YOS SUDARSO PROJECT BALIKPAPAN, EAST KALIMANTAN  
DINAS PEKERJAAN UMUM , 2001  
- Retaining Wall Work:  
  • Driving Concrete Sheet Pile and Common Embankment.
  • Prestressed Concrete Spun Pile 94 pcs of Ø 600 mm: 11 m, JIS A 5335-1985.
 
   
PILE SLAB PROJECT JALAN INHUTANI, BERAU, EAST KALIMANTAN  
DINAS PEKERJAAN UMUM , 2001  
- Gravity Retaining Wall  
  • Pile Slab, length 40 m, Steel Pipe Pile Ø 400 mm -18 m, 27 pcs.
 
- Reinforced Concrete Beam and Slab.  
- Asphalt Road Works  
   
RECLAMATION PROJECT, PASAR BARU, BALIKPAPAN, EAST KALIMANTAN  
DINAS PEKERJAAN UMUM , 2001  
- Reclamation Work, Phase III:  
  • Concrete Sheet Pile for Retaining Wall, Back Fill with Sand and selected material and Armour Stone 500 kg/pcs for counter weight.
 
   
RETAINING WALL WORK PROJECT JALAN A. YANI, TANJUNG REDEB, BERAU, EAST KALIMANTAN  
DINAS PEKERJAAN UMUM , 2000 - 2001  
- Retaining Wall Work:  
  • Steel Sheet Pile, ( FSP IIIA x 15 m, FSP IVA x 15 m, FSP IVA x 20 m.)
  • Anchor Steel Pipe Pile, Ø 500 and Ø 600 mm and Soil Filling 40,000 m3.
 
   
CONCRETE SHEET PILE WORK, JALAN PASAR BARU, BALIKPAPAN, EAST KALIMANTAN  
DINAS PEKERJAAN UMUM , 2000  
- Retaining Wall Work:  
  • Concrete Sheet Pile, ( W 350 B ).