MECHANICAL, ELECTRICAL AND INSTRUMENTATION WORK
 
 
Offshore Work
 
 
......................................................................................................................................................................................................................................
 
 
Offshore Works
 
     
     
 
WELL CONNECTION AT TAMBORA-TUNU 2006-2008 PROJECT (Package #2), TAMBORA, EAST KALIMANTAN
TOTAL E&P INDONESIE , April 2007 - April 2009
- EPC of Well Connections:
  • Fabrication and Installation of Wellhead Platform
  • Fabrication and Installation of Wellhead Accessories:      
           + Gin pole, Wire line operating platform and Installation of wellhead pipings
  • Fabrication and Installation of Adjacent & Remote Flowlines
  • Painting and NDE,
  • Procurement of instrumentation material
     
PROCUREMENT, FABRICATION, INSTALLATION, TESTING ASSOCIATED WITH "SAPI" PLATFORM AND PIPELINE SYSTEM PROJECT, SAPI, EAST KALIMANTAN
UNOCAL INDONESIA Company , July 2005 - April 2006
- Engineering
  • Provide detail engineering for all discipline,
  • Pre. and Decommisioning assistance
- Offshore Installation
  • Install 12" pipeline for 6 km, including dogleg and riser
  • Pilling work with 20" - 36 meter = 8 ea
  • Supply, Fabrication and Install for wellhead platform = 35 M-ton
  • Supply, Fabrication and Install for manifold platform = 85 M-ton
  • Supply, Fabrication and Install for misc. platform = 8 M-ton.
  • Pile driving, Wellhead and Manifold platform, + Misc. Platform, Appurtenance installation.
  • Pipeline Installation, Ø 12" length 6 km, +? Risers Installation, Tie-Ins and Testing
- Onshore Installation
  • Install 12" pipeline for 4 km (shoreline to GHSF) and 1,1 km (GHSF to tie-in points)
  • Install 8" pipeline for 1,1 km (GHSF to tie-in points)
  • Supply, install for 2 Pig launcher and 2 pig receiver and Fabrication and Install for Tie-in facilities
  • Site preparation for pipeline ROW (50 mtr wide x 5,000 mtr length).
  • Pipeline installation, Ø 8", Ø 12" length 4 km, + Tie-Ins and Testing.
     
TUNU REMOTE AND ADJACENT WELL CONNECTION PROJECT TUNU, EAST KALIMANTAN
TOTALFINAELF E&P INDONESIE , January 2003 - August 2003
- Fabrication and Installation of Ø 8" Offshor Flowline and Ø 1" service line 2 km :
  • Piling and Installation of Wellhead Platforms, Offshore Ø 8" Flowline and Ø I" service line.
     
TATUN 4 ( Four) ADJACENT WELL CONNECTION PROJECT TAMBORA-TUNU, EAST KALIMANTAN
TOTALFINAELF E&P INDONESIE , May 2003 - December 2003
- Fabrication and Installation of Ø 8" Offshore Flowline and Ø 1" service line
  • Piling Ø 20" and Installation of Wellhead Platforms for 4 Adjacent Wells
     
PROVISION OF 2003 TATUN REMOTE / ADJACENT WELL CONNECTION TAMBORA - TUNU PROJECT, TAMBORA, EAST KALIMANTAN
TOTAL E&P INDONESIE , June 2003 - June 2005
- Engineering, Fabrication and Installation of Ø 8" Offshore Flowline and Ø 1" Service line
  • Piling Ø 20" and Installation of Wellhead Platform for 8 Remote Wells and 41 Adjacent Wells, 2 Single Wells.
- Supply, Fabrication and Installation of Instrument
     
AUTOMATIC VALVES AND PIG TRAP INSTRUMENT PROJECT TUNU, EAST KALIMANTAN
TOTALFINAELF E&P INDONESIE , July 2001 - December 2002
- Installation of Valves at 6 River Crossing Line and Installation of Cover Dams
- Fabrication and Installation of Walkways
     
PANTAI # 2 PIPELINE AND LAWE-LAWE PRODUCE WATER OUTFALL PIPELINE LAWE- LAWE, EAST KALIMANTAN
UNOCAL INDONESIA Company , August 2001 - October 2002
- UNOCAL INDONESIA Company , August 2001 - October 2002
- Produced Water Outfall Pipeline and Tie-ins
- Installation of Water Dispenser, Boat Landing and Davit Crane
     
VARIOUS ADJACENT TATUN WELL CONNECTION YEAR 2001 - 2002 TATUN, EAST KALIMANTAN
TOTAL E&P INDONESIE , October 2000 - October 2002
- Fabrication and Installation of Flowlines, GTS Manifolds
- Wellhead Spools, Piles, WHPF, Walkway, etc.
     
TN - I 3 AND TN - I 10 WELL CONNECTIONS PROJECT, TUNU, EAST KALIMANTAN
TOTALFINAELF E&P INDONESIE , 2000
- Installation of Ø 8" Offshore Flowline, Ø I" Service line 2.50 km and Wellhead Platforms
 
REMOTE WELL CONNECTION TN L10, PROJECT TUNU, EAST KALIMANTAN
TOTAL E&P INDONESIE , 1999
- Installation of Ø 8" Offshore Flowline, Ø I" Service line 1.80 km and Wellhead Platforms
 
CONSTRUCTION OF PIPELINE RIVER CROSSING MUTIARA TO NILAM OIL PIPELINE PROJECT, NILAM, EAST KALIMANTAN
VICO INDONESIA , 1997
- Pipeline Installation by Horizontal Directional Drilling :
  • Dondang River 1,100 m x 10" NPS,
  • Sanga-Sanga River 1,573 m x 10" NPS.
  • Kutai Lama River 810 m x 10" NPS.
 
UNOCAL PANTAI PIPELINE PROJECT, TANJUNG JUMLAI, EAST KALIMANTAN
UNOCAL INDONESIA Company , 1991
- Onshore Pipeline, Piping Ø 10", length 7.00 km
- Swampy area 1,200 m
- Offshore Pipeline, Piping Ø 6", length 1.60 km