| WELL CONNECTION AT TAMBORA-TUNU 2006-2008 PROJECT (Package #2), TAMBORA, EAST KALIMANTAN |
| TOTAL E&P INDONESIE , April 2007 - April 2009 |
| - EPC of Well Connections: |
- Fabrication and Installation of Wellhead Platform
- Fabrication and Installation of Wellhead Accessories:
+ Gin pole, Wire line operating platform and Installation of wellhead pipings
- Fabrication and Installation of Adjacent & Remote Flowlines
- Painting and NDE,
- Procurement of instrumentation material
|
| |
|
|
| PROCUREMENT, FABRICATION, INSTALLATION, TESTING ASSOCIATED WITH "SAPI" PLATFORM AND PIPELINE SYSTEM PROJECT, SAPI, EAST KALIMANTAN |
| UNOCAL INDONESIA Company , July 2005 - April 2006 |
| - Engineering |
- Provide detail engineering for all discipline,
- Pre. and Decommisioning assistance
|
| - Offshore Installation |
- Install 12" pipeline for 6 km, including dogleg and riser
- Pilling work with 20" - 36 meter = 8 ea
- Supply, Fabrication and Install for wellhead platform = 35 M-ton
- Supply, Fabrication and Install for manifold platform = 85 M-ton
- Supply, Fabrication and Install for misc. platform = 8 M-ton.
- Pile driving, Wellhead and Manifold platform, + Misc. Platform, Appurtenance installation.
- Pipeline Installation, Ø 12" length 6 km, +? Risers Installation, Tie-Ins and Testing
|
| - Onshore Installation |
- Install 12" pipeline for 4 km (shoreline to GHSF) and 1,1 km (GHSF to tie-in points)
- Install 8" pipeline for 1,1 km (GHSF to tie-in points)
- Supply, install for 2 Pig launcher and 2 pig receiver and Fabrication and Install for Tie-in facilities
- Site preparation for pipeline ROW (50 mtr wide x 5,000 mtr length).
- Pipeline installation, Ø 8", Ø 12" length 4 km, + Tie-Ins and Testing.
|
| |
|
|
| TUNU REMOTE AND ADJACENT WELL CONNECTION PROJECT TUNU, EAST KALIMANTAN |
| TOTALFINAELF E&P INDONESIE , January 2003 - August 2003 |
| - Fabrication and Installation of Ø 8" Offshor Flowline and Ø 1" service line 2 km : |
- Piling and Installation of Wellhead Platforms, Offshore Ø 8" Flowline and Ø I" service line.
|
| |
|
|
| TATUN 4 ( Four) ADJACENT WELL CONNECTION PROJECT TAMBORA-TUNU, EAST KALIMANTAN |
| TOTALFINAELF E&P INDONESIE , May 2003 - December 2003 |
| - Fabrication and Installation of Ø 8" Offshore Flowline and Ø 1" service line |
- Piling Ø 20" and Installation of Wellhead Platforms for 4 Adjacent Wells
|
| |
|
|
| PROVISION OF 2003 TATUN REMOTE / ADJACENT WELL CONNECTION TAMBORA - TUNU PROJECT, TAMBORA, EAST KALIMANTAN |
| TOTAL E&P INDONESIE , June 2003 - June 2005 |
| - Engineering, Fabrication and Installation of Ø 8" Offshore Flowline and Ø 1" Service line |
- Piling Ø 20" and Installation of Wellhead Platform for 8 Remote Wells and 41 Adjacent Wells, 2 Single Wells.
|
| - Supply, Fabrication and Installation of Instrument |
| |
|
|
| AUTOMATIC VALVES AND PIG TRAP INSTRUMENT PROJECT TUNU, EAST KALIMANTAN |
| TOTALFINAELF E&P INDONESIE , July 2001 - December 2002 |
| - Installation of Valves at 6 River Crossing Line and Installation of Cover Dams |
| - Fabrication and Installation of Walkways |
| |
|
|
| PANTAI # 2 PIPELINE AND LAWE-LAWE PRODUCE WATER OUTFALL PIPELINE LAWE- LAWE, EAST KALIMANTAN |
| UNOCAL INDONESIA Company , August 2001 - October 2002 |
| - UNOCAL INDONESIA Company , August 2001 - October 2002 |
| - Produced Water Outfall Pipeline and Tie-ins |
| - Installation of Water Dispenser, Boat Landing and Davit Crane |
| |
|
|
| VARIOUS ADJACENT TATUN WELL CONNECTION YEAR 2001 - 2002 TATUN, EAST KALIMANTAN |
| TOTAL E&P INDONESIE , October 2000 - October 2002 |
| - Fabrication and Installation of Flowlines, GTS Manifolds |
| - Wellhead Spools, Piles, WHPF, Walkway, etc. |
| |
|
|
| TN - I 3 AND TN - I 10 WELL CONNECTIONS PROJECT, TUNU, EAST KALIMANTAN |
| TOTALFINAELF E&P INDONESIE , 2000 |
| - Installation of Ø 8" Offshore Flowline, Ø I" Service line 2.50 km and Wellhead Platforms |
| |
| REMOTE WELL CONNECTION TN L10, PROJECT TUNU, EAST KALIMANTAN |
| TOTAL E&P INDONESIE , 1999 |
| -
Installation of Ø 8" Offshore Flowline, Ø I" Service line 1.80 km and Wellhead Platforms |
| |
| CONSTRUCTION OF PIPELINE RIVER CROSSING MUTIARA TO NILAM OIL PIPELINE PROJECT, NILAM, EAST KALIMANTAN |
| VICO INDONESIA , 1997 |
| -
Pipeline Installation by Horizontal Directional Drilling : |
- Dondang River 1,100 m x 10" NPS,
- Sanga-Sanga River 1,573 m x 10" NPS.
- Kutai Lama River 810 m x 10" NPS.
|
| |
| UNOCAL PANTAI PIPELINE PROJECT, TANJUNG JUMLAI, EAST KALIMANTAN |
| UNOCAL INDONESIA Company , 1991 |
| -
Onshore Pipeline, Piping Ø 10", length 7.00 km |
| -
Swampy area 1,200 m |
| -
Offshore Pipeline, Piping Ø 6", length 1.60 km |
| |
| |
| |
| |
| |
| |
| |
| |
| |